VIEW CATALOG


PRODUCT SEARCH


QUICK QUESTIONS

Name:
Email(Optional):
State/Region:
Phone:
Product Description
Verification Code:
This Is CAPTCHA Image

To verify content, please enter in the characters in the image above (Case sensitive)

WEIZEL FACTS

Weizel presently serves 1,755 correctional and prison facilities in North America 2006 Incarceration Facts

U.S.A: 2.2 Million inmates in approx. 7,000 facilities.

Canada: 38,000 inmates in approx. 450 facilities

Weizel presently serves 2,454 hospitals in North America


TOOLS & SERVICES

Currency Converter
Form Center
How-To: Request Quote
Pricing Policy



SecuringCosmos.com
Detention Upgrade & Retro-fit Applications
Weizel Sliding Door, Frame, Track set installation procedures (Knock down frames)

Step 1

Header and Extended Piece Installation(KD)

  • Put header and extender up as template for anchor installation
  • Remove header and extender
  • Drill 1/2" quick bolts, or thread rod with epoxy, anchoring system
    (installer preference, not provided by Weizel)
  • Cut quick bolts/thread rod flush to block
  • * header/extended peice must be installed flush to block work; block
    protruding off flush line must be ground down by installer.




Step 2

Jamb Installation

  • Fit jambs to block(installer may have to adjust length of jamb due to floor tolerances)
  • Drill 3/8" quick bolts(not provided by Weizel)
  • All quick bolts should be torqued in place
  • Then cut flush with frame
  • Puddle weld bolts to frame

Step 3

Weld Header/Extended Piece to wall

  • Puddle weld header/extended piece to wall
  • Weld top jamb completely to header

 

Step 4

Install Trackset

  • Install track set level; trackset must sit flush against framework for welding
  • Bottom of Trackset Point to be measured as follows:
    • ex: if Clear Opening = 2110
    • set bottom of trackset at 30mm above 2110
    • However, if floor is not level you must set at 2140 (2110 + 30) at highest point off finished floor



Step 5

Install Rollers to Door Hanger and Hang Door

  • Temporarily install track set cover and adjust door to proper height. Installer should ensure that door hanger and cover do not interfer with each other


Step 6

Install Floor Mounted Guide

  • Check distance(with door in closed position) between door and frame lock jamb at top of door
  • This distance must be maintained through height of door at lock jamb side.
  • Install floor guide as required using 4 - 3/8" quick bolts(not provided by Weizel)



Step 7

Weld on Receiver Column

  • Line up lock bolt in open position with receiver column keeper pocket.
  • Receiver column may have to be adjusted off face of frame due to walls out of plum

Step 8

Install Track Set Cover with screws provided



 

 